Development of the control system of solar batteries operation emulator for land test of satellite power supply systems

Specification

 

  • Development of a system from 6 independent blocks
  • 4 blocks of indication of the current parameters of voltage and current of power supplies
  • 1 block of indication of the modes
  • Entrance / exit to a shadow
  • Entrance / exit time from a shadow
  • Manual / Automatic modes
  • Counter of working time
  • Auxiliary modes
  • 1 central control unit
  • Training of the personnel

 

Terms of completition: 2 months.

 

Beginning of the project: 03.2003

Termination: 05.2003